|
~ Plumber ~ Installation ~ Blocked drains ~ Domestic ~ Leaks ~ PW Plumbing ~
.jpg) |
.jpg) |
|
Bathroom stripped out and ready to refit
|
New WC and towel radiator. Slate floor tiles.
| |
| |
|
This bathroom was recently fitted in Chigwell. The bath was removed and replaced with a mixer shower. All of the tiling was by me as was the fitting of the sanitary ware.
|
.jpg) |
.jpg) |
|
New basin with monolever tap.
|
New shower enclosure
| | |
~ Leaking taps and Overflows ~ 24 hour call out ~ Bathroom ~ Radiator ~ |